Vinco Manufacturing, Inc.




Vinco Manufacturing, Inc. - Installing the Plumb Jack

Installation

Step #1 

The Plumb-Jack mounting bracket ends are screwed out to the desired length.  For an 8' wall the threads should be backed out 1" - 2", 9' walls 2" - 3", and if used on a 10' wall no more than 6"
( WARNING! ).

Adjust brackets to desired length.

Step #2

The top bracket is installed with two #10 wood hex-head screws, 2-1/2" in length.
(A 2 1/2" x 3/16" pole barn screw can also be used.)

Attach top bracket to wall.

Step #3

The bottom end of the Plumb-Jack is attached to the floor, at the floor joist with two #10 wood hex head screws, 2-1/2" in length. Or on a concrete floor with two 2-1/2" x 1/4" tapcons.
Attach bottom bracket to floor.

Step #4

After the Plumb-Jacks have been installed at the recommended 8' intervals along the wall.   The wall can be easily plumbed by simply making a few quick & easy turns to the Plumb-Jack bars.
Turn square tubing until wall is plumb.